(1) single-headed hydraulic expanded de-coiler
(2) Main power: 5.5 KW
(3)Capacity of the de-coiler: 6 tons
(4) Power of the open and closure of segments: hydraulic
(5) Power of rotation of segments : hydraulic
(6) Number of segment: 4
(7) Range of segment expansion: 460 ~ 515mm
(8) Inner diameter of coil: 508mm
(9) Maximum outer diameter of coil: 1500mm
(10)Maximum width of coil: 1300mm
(11)Height of center of the mandrel: 1.2M
(12)Feeding speed: 0~35m/minute
(13)Approximate Size: Length: 2.9M Width : 1.1M Height : 1.6 M
(14) Speed control: one sensor is used to control the speed of feeding the material.
(15) Methods of operation: manual and automatic control.
Hydraulic uncoiler main specification: |
(1) Single-headed hydraulic expanded de-coiler |
(2) Main power: 5.5 KW |
(3) Capacity of the de-coiler: 6tons |
(4) Power of the open and closure of segments: Hydraulic |
(5) Power of rotation of segments: Hydraulic |
(6) Number of segment: 3 |
(7) Range of segment expansion: 460 ~ 515mm |
(8) Inner diameter of coil: 508mm |
(9) Maximum outer diameter of coil: 1500mm |
(10) Maximum width of coil: 1300mm |
(11) Height of center of the mandrel: 1.2M |
(12) Feeding speed: 0~35m/minute |
(13) Approximate Size: Length: 2.9M Width: 1.1M Height: 1.6 M |
(14) Speed control: One sensor is used to control the speed of feeding the material. |
(15) Methods of operation: Manual and automatic control. |
Our services:
1.Standardization of Service "212"
2: response in 2 hours
1: provide solution in 1 day
2: solve complaint in 2 days
2.Installation Service
Installation Services are available with all HYMT machines. We dispatch technician to customer's
factory for installation and preoperation of machines.
3.Training Service
Our technician is available to your factory and offer training of how to use our machines. As well, you
may send your technician to our company to learn how to operate machines.
4.Quality Guarantee
We guarantee the quality of machine (e.g. processing speed and working performance is the same as
the data of samples making). We sign the agreement with detailed technical data.
We arrange final test before shipment. We run the machine for a few days, and then use customer's
materials for test. After making sure machine is the best performance, then make shipments.